Rowlett Heating- How to Lay Laminate Flooring
By Leon Burgett
Laying laminate flooring is a relatively easy task. However, it is important that all materials are properly prepared and scales because otherwise even the most experienced DIY expert to make unnecessary mistakes. The following guide provides step by step instructions to put the laminate flooring. You should first verify that the substrate is suitable for you Krono Original laminate flooring at the top, because the individual plans are not suitable for all types of substrate.
Laminated yoke assembly
The floor must be completely flat, dry, clean and solid. It 'very important to improve and smooth the roughness of more than three millimeters more than a meter. You must use the PE film as a moisture barrier.
Installation of a laminated wooden boards
Soil should be set loose and irregular surfaces must be resolved to ensure a flat surface and stand firm. Mount the original Krono laminate flooring at right angles to the longitudinal direction of the planks of wood. You can not use PE foil over wood subfloors.
Laminated on wood panel
Loose boards must be strengthened and irregularities leveled. The cards are securely connected to the sub-floor so that the cracks later.
Installation of PVC laminate or linoleum
These types of old flooring must be removed.
The installation of laminate flooring to heat the hot water through the soil
Ask an expert heating to heat your trusted floor until it is dry. They have the skills and folders. A surface temperature of 25 degrees Celsius is recommended and you should never exceed 28 degrees Celsius. Removing old flooring.
The residual moisture
Mass must never exceed the following residues:
1) cement mortar: underfloor heating 1.8 centimeters per cent without underfloor heating 2 percent CM.
. Anhydride screed 2): With underfloor heating 0.3 percent, without floor heating of 0.5 cm per cent.
Before installing your laminate flooring please make sure you go through these lists.
A.) Tools list
You should have the following tools at hand whenever a corresponding
Krono Original laminate flooring:
* Spacer shims
* circular saw, jig saw or hand saw with a finetooth
* Angle of door frames undercutting
* Tapemeasure, pencil
* Fixing kit stratified
* block of wood, hammer
* The underlying acoustic sound (of the earth without a sound absorber)
B.) Materials and equipment list
* precise measurements of your room
* Laminated
* ClickSeal a tube is sufficient to ten square meters of laminate flooring
* Skirting - Solid wood, PVC or MDF with the habit of real wood
* Scotland or beads quadrant transition and edge profiles
* clips (30 clips per lot floor Krono Original)
* vapor barrier layer, the gold / silver at the base of dunes
* Plastic foam
Please also note that the excess is sent to soundproofing is necessary to laminate flooring without (SAS Sound Absorb System). In certain situations it may be necessary to seal or similar Clickguard joint sealant and adhesive / binder.
Before installation: Keep container floor for 48 hours under the same conditions as for mounting.
An important requirement for the installation and durability of laminate flooring is a climate within the range of 20 C and a relative humidity of 50 to 70 percent. The surface must be absolutely flat, dry, clean and solid.
When mounting on a sub-floor minerals such as concrete tiles, cement screed, anhydrite screed and stone, you need to measure the moisture first. The cast must not exceed the following residual moisture:
. Cement screed 1): With underfloor heating of 1.8 cm per cent, without heating 2 percent CM.
2) Anhydride screed: underfloor heating 0.3 percent, without underfloor heating 0.5 percent CM.
Before getting on the sub-layers of concrete, you must install a vapor barrier
Pad (Gold / Silver sand dune surfaces) to protect against moisture. Install the sheets with an overlap of 20 cm and secure it with aluminum tape.
The carpet is not adequately supported, you must remove all traces of the carpet before installing the laminate. Laminate flooring is defined as a "floating" floor, which can not be fixed in the ground. Please use two sub-millimeter layer of polyethylene foam or other suitable support up to 3 mm thick insulation of transmission for sound insulation of floors without SAS. Please have leaves in the same direction as the panels. You should have the floor open packages immediately.
In general, you have three options for installing laminate flooring:
First) quickly without glue
Second) Installation ClickSeal with mastic or equivalent. This ensures that the soil is permanently protected against the effects of moisture from above. The floor can always be taken up and relaid.
. 3) the adhesive provides a permanent protection against moisture, but the work is long and complicated and the ground can not be reused.
Laying laminate
If walls are not straight, please trace the line of the wall on the first row of panels and saw the panels accordingly. Before installing the panels to measure the depth of the first chamber. If the last row of panels with a width of less than 5 centimeters, divided equally between the row of the left first and the last of the panels so that the two lines are cut to fit the width of the plate itself.
Always keep a distance of 12-15 mm on walls, pipes, columns, door jams, etc. You can use spacers to solve this distance. Expansion joints (at least 2 cm wide) are needed if the area layout is more than 8 feet long or wide. Also note that it is also necessary when the floor continuously over more than one room. Here, the areas must be interrupted in the area of ??the frame. For this purpose, use profiles in our range. These expansion joints can be professionally covered using the appropriate profiles.
Tip: Place the panels along according to the main light source!
Start putting in the left corner of the room. Protruding lower groove cheek should be facing layer. Place the first row of panels by combining the first two, and then each additional panel with the help of the installation (out of court with the language panel vertical alignment). Tip: In general, you should connect to the length of the head area of ??the two joints and eventually align elements. This prevents damage to the close panels.
Now click on the panel to request, in a flat position with the palm of the hand to achieve a pre-blocking effect is made in full width of the panel.
To make this shock is on the panel along the joint head. Please make sure that the power of the hand over of about 5 to 10 millimeters over the edge. This ensures the alignment of the surfaces of the two joint committees. Repeat the above procedure to put the entire first row of panels. Use the corner space at a safe distance of 12 inches -15 is maintained by the wall!
Start the second row from the left side of the language by adding a long side of the panel 30 degrees angle to the wall of the channel and the panels that have already been given (1 floor) and run up and down gently. Start each new row of the remaining piece (at least 20 cm in length) and the previous line. Transverse joints between the panels of a row and the next should be at least 40 cm.
The following panels were first introduced on the long side and then just before going down the side of the head is pressed firmly against the panel until the joint previous recoveries.
Now touch the plate with the palm of the hand area of ??the cross joint to lock-in effect is achieved across the width of the panel. Lock the end joints to hit lightly with a hammer and wedge. Use a suitable support, too. Place all the remaining panels, repeat the given sequence.
If necessary, close the transverse joints by pressing the side with an appropriate block tapping. To cut the last row of the panel to size, rotate it 180 degrees, place it with the inside of the range alongside the already established (Groove Groove plays plays). Leave the wall distance on the front. Mark panel saws. To avoid burst inside edges down if you use a jigsaw or circular saw to cut the panels. Otherwise, if the panels with an interior facing up. If necessary, use the pole to determine the final panel in a row. After installing the panels remove spacers.
Holes that are three inches larger than the diameter of the pipe should be cut heating pipes. He saw a "adapter piece" V-shaped, glue, put in place and secure it with a corner until the glue has hardened. Then cover the wound with radiator rosettes.
Please shorten wooden door frames where an element of sound insulation fits under him, and then laminate can travel without restrictions, again, if the climate of the room.
For a perfect finish on a wall, set the plinth clips from 40 to 50 inch spacing along the wall, then attach the matching skirting cut appropriate.
Laminated yoke assembly
The floor must be completely flat, dry, clean and solid. It 'very important to improve and smooth the roughness of more than three millimeters more than a meter. You must use the PE film as a moisture barrier.
Installation of a laminated wooden boards
Soil should be set loose and irregular surfaces must be resolved to ensure a flat surface and stand firm. Mount the original Krono laminate flooring at right angles to the longitudinal direction of the planks of wood. You can not use PE foil over wood subfloors.
Laminated on wood panel
Loose boards must be strengthened and irregularities leveled. The cards are securely connected to the sub-floor so that the cracks later.
Installation of PVC laminate or linoleum
These types of old flooring must be removed.
The installation of laminate flooring to heat the hot water through the soil
Ask an expert heating to heat your trusted floor until it is dry. They have the skills and folders. A surface temperature of 25 degrees Celsius is recommended and you should never exceed 28 degrees Celsius. Removing old flooring.
The residual moisture
Mass must never exceed the following residues:
1) cement mortar: underfloor heating 1.8 centimeters per cent without underfloor heating 2 percent CM.
. Anhydride screed 2): With underfloor heating 0.3 percent, without floor heating of 0.5 cm per cent.
Before installing your laminate flooring please make sure you go through these lists.
A.) Tools list
You should have the following tools at hand whenever a corresponding
Krono Original laminate flooring:
* Spacer shims
* circular saw, jig saw or hand saw with a finetooth
* Angle of door frames undercutting
* Tapemeasure, pencil
* Fixing kit stratified
* block of wood, hammer
* The underlying acoustic sound (of the earth without a sound absorber)
B.) Materials and equipment list
* precise measurements of your room
* Laminated
* ClickSeal a tube is sufficient to ten square meters of laminate flooring
* Skirting - Solid wood, PVC or MDF with the habit of real wood
* Scotland or beads quadrant transition and edge profiles
* clips (30 clips per lot floor Krono Original)
* vapor barrier layer, the gold / silver at the base of dunes
* Plastic foam
Please also note that the excess is sent to soundproofing is necessary to laminate flooring without (SAS Sound Absorb System). In certain situations it may be necessary to seal or similar Clickguard joint sealant and adhesive / binder.
Before installation: Keep container floor for 48 hours under the same conditions as for mounting.
An important requirement for the installation and durability of laminate flooring is a climate within the range of 20 C and a relative humidity of 50 to 70 percent. The surface must be absolutely flat, dry, clean and solid.
When mounting on a sub-floor minerals such as concrete tiles, cement screed, anhydrite screed and stone, you need to measure the moisture first. The cast must not exceed the following residual moisture:
. Cement screed 1): With underfloor heating of 1.8 cm per cent, without heating 2 percent CM.
2) Anhydride screed: underfloor heating 0.3 percent, without underfloor heating 0.5 percent CM.
Before getting on the sub-layers of concrete, you must install a vapor barrier
Pad (Gold / Silver sand dune surfaces) to protect against moisture. Install the sheets with an overlap of 20 cm and secure it with aluminum tape.
The carpet is not adequately supported, you must remove all traces of the carpet before installing the laminate. Laminate flooring is defined as a "floating" floor, which can not be fixed in the ground. Please use two sub-millimeter layer of polyethylene foam or other suitable support up to 3 mm thick insulation of transmission for sound insulation of floors without SAS. Please have leaves in the same direction as the panels. You should have the floor open packages immediately.
In general, you have three options for installing laminate flooring:
First) quickly without glue
Second) Installation ClickSeal with mastic or equivalent. This ensures that the soil is permanently protected against the effects of moisture from above. The floor can always be taken up and relaid.
. 3) the adhesive provides a permanent protection against moisture, but the work is long and complicated and the ground can not be reused.
Laying laminate
If walls are not straight, please trace the line of the wall on the first row of panels and saw the panels accordingly. Before installing the panels to measure the depth of the first chamber. If the last row of panels with a width of less than 5 centimeters, divided equally between the row of the left first and the last of the panels so that the two lines are cut to fit the width of the plate itself.
Always keep a distance of 12-15 mm on walls, pipes, columns, door jams, etc. You can use spacers to solve this distance. Expansion joints (at least 2 cm wide) are needed if the area layout is more than 8 feet long or wide. Also note that it is also necessary when the floor continuously over more than one room. Here, the areas must be interrupted in the area of ??the frame. For this purpose, use profiles in our range. These expansion joints can be professionally covered using the appropriate profiles.
Tip: Place the panels along according to the main light source!
Start putting in the left corner of the room. Protruding lower groove cheek should be facing layer. Place the first row of panels by combining the first two, and then each additional panel with the help of the installation (out of court with the language panel vertical alignment). Tip: In general, you should connect to the length of the head area of ??the two joints and eventually align elements. This prevents damage to the close panels.
Now click on the panel to request, in a flat position with the palm of the hand to achieve a pre-blocking effect is made in full width of the panel.
To make this shock is on the panel along the joint head. Please make sure that the power of the hand over of about 5 to 10 millimeters over the edge. This ensures the alignment of the surfaces of the two joint committees. Repeat the above procedure to put the entire first row of panels. Use the corner space at a safe distance of 12 inches -15 is maintained by the wall!
Start the second row from the left side of the language by adding a long side of the panel 30 degrees angle to the wall of the channel and the panels that have already been given (1 floor) and run up and down gently. Start each new row of the remaining piece (at least 20 cm in length) and the previous line. Transverse joints between the panels of a row and the next should be at least 40 cm.
The following panels were first introduced on the long side and then just before going down the side of the head is pressed firmly against the panel until the joint previous recoveries.
Now touch the plate with the palm of the hand area of ??the cross joint to lock-in effect is achieved across the width of the panel. Lock the end joints to hit lightly with a hammer and wedge. Use a suitable support, too. Place all the remaining panels, repeat the given sequence.
If necessary, close the transverse joints by pressing the side with an appropriate block tapping. To cut the last row of the panel to size, rotate it 180 degrees, place it with the inside of the range alongside the already established (Groove Groove plays plays). Leave the wall distance on the front. Mark panel saws. To avoid burst inside edges down if you use a jigsaw or circular saw to cut the panels. Otherwise, if the panels with an interior facing up. If necessary, use the pole to determine the final panel in a row. After installing the panels remove spacers.
Holes that are three inches larger than the diameter of the pipe should be cut heating pipes. He saw a "adapter piece" V-shaped, glue, put in place and secure it with a corner until the glue has hardened. Then cover the wound with radiator rosettes.
Please shorten wooden door frames where an element of sound insulation fits under him, and then laminate can travel without restrictions, again, if the climate of the room.
For a perfect finish on a wall, set the plinth clips from 40 to 50 inch spacing along the wall, then attach the matching skirting cut appropriate.
About the Author:
Looking to find the best deal on Rowlett Heating , then visit http://www.airconditioningandheating-rowlett.us to find the best advice on Heating for you.
Diposting oleh yenimulyanister di 00.56
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar